Steady EddieEnquiries
The overhead drilling robot, a black and white tracked base on four outrigger pads, its column pressing the drill head to a concrete ceiling.
Site Hand · Overhead drilling

Anchor holes overhead. Dust at the bit.

The Overhead Drilling Robot is a drilling column, model OHD-A1, for the STE Site Hand Tradesman. It is designed to drill anchor holes up into concrete soffits from the drawings, take the dust at the bit and log every hole. Your crew decides where the work goes, and sets the anchors.

The arms-up part of the job.

Hole after hole from a lift or a ladder: arms up, hammer drill, silica dust in the face. Overhead drilling is hard on shoulders and lungs, and the trades who do it earn every hanger they set.

This attachment takes that part. It puts the drill on a column, the dust in a sealed extractor and the layout in the job file. The judgement stays with the trade.

  • Threaded-rod hanger holes in concrete soffits
  • Strut trapeze support anchors
  • Sleeve and riser support anchors
  • Seismic bracing anchors
  • Mechanical, electrical and plumbing support anchors

One hole, start to finish.

The same steps on every hole, and a record at the end of each one.

  • From the drawings. The job computer on the truck turns the drawing into a hole list. The robot carries the job file into the building and is designed to run it on its own battery pack.
  • Position fixed. A robotic total station tracks a 360° prism on the head. The robot is designed to find each hole from it, and a head camera checks the soffit.
  • Checked before it drills. Each hole is scanned for steel and live cable, or drilled to a signed scan map loaded into the job. A drill-signature stop backs both.
  • Sealed and drilled. A spring-loaded shroud seats on the soffit and braces there. The rotary hammer feeds to depth under force control.
  • Dust taken at the bit. A Class H extractor rides on the deck and pulls through the shroud on every hole.
  • Marked and logged. Position, depth and result are logged for each hole and come back as an as-drilled report.
Close view of the drill head with its dust shroud sealed against the concrete ceiling, the prism and dust hose, and a row of drilled holes.

Plant the pads, then reach.

The column rides the Site Hand Tradesman, the door-width tracked base, fitted without arms. A three-stage column locks to the quick-attach on the mast head and carries the drill to the soffit.

The base drives to each set-up, plants its four outrigger pads and raises the column until the shroud seats. Full height and full reach are used only on the four loaded pads: 700 mm of radial slide on pads, 280 mm on tracks alone.

Bits change from a six-slot magazine on the hull, with an optical gauge to check the diameter.

A close view of a Site Hand outrigger leg planted on a steel pad and a timber block beside the track, on a concrete floor.

OHD-A1, the numbers.

Dimensions and masses are plain figures. Rates and tolerances are what the attachment is designed to hold.

ItemValue
Soffit height above the standing floor2,400 to 5,000 mm
Design soffit height3,600 mm
Radial slide reach, on outrigger pads700 mm
Reach on tracks only280 mm
Bit diameter6 to 16 mm, SDS-plus
Hole depth25 to 100 mm
Drilling rateDesigned for 40 holes an hour, sustained
Hole positionDesigned to hold ±10 mm, horizontal, on 95 holes in 100
Hole depthDesigned to hold +3 / -0 mm
Bit magazine6 slots
Attachment mass87 kg (column, slide, tool, extractor, magazine, hose)
Tool mass at the head21 kg
Feed force80 to 200 N
DrillSDS-plus rotary hammer, 2 to 3 J class
Dust extractorClass H, on board, at least 219 m³/h, automatic filter cleaning
Battery pack10 kWh
Energy use at the designed rate1.27 kWh an hour, calculated
Site charging240 V, 30 A plug, about 7 kW, overnight from site temporary power
CrewOne operator for one or two robots; a second person sets anchors and hangers

How it stays safe.

AI plans, rules govern, humans authorize, safety has veto. Sensing can only remove authority, never add it.

  • The operator decides. One operator runs the work from a tablet: starts each job, clears every flag, and can pause, take over or re-plan.
  • A flag stops the hole, not the judgement. A hit in the slab, a live-cable reading, an out-of-range soffit or a lost position fix flags the hole for the operator. A flagged hole is moved or sent to the engineer.
  • Any stop stops motion. It does not matter where the stop comes from. More on the Site Hand safety page.
  • Stable before it reaches. The column goes to full height only with all four pads loaded.
  • If the link drops. Portable Wi-Fi mesh repeaters are carried in with the robot. Without the link, the robot runs its loaded job alone, inside the same rules.
  • People set the anchors. A second person sets anchors and hangers once the drilled area is released to them.
An operator with a tablet beside a total station on a tripod while the robot drills the ceiling well across the floor.

How a shift runs, and what comes on the truck.

The truck brings the robot, the packs and the total station to site. The robot drives through a standard door, goes up to the floor and sets up under the first bay. Pads down, column up, and each hole is checked, drilled, marked and logged. Then the base moves to the next set-up. At the end of the shift the truck returns the as-drilled report.

The Robot Support Van page covers the truck side in full.

  • Truck. Class 5 and up. It carries, charges and computes for the robot.
  • Robots per truck. One as standard, two as an option.
  • Loading. Self-drive up the truck ramp, or the body crane on the lift points.
  • Battery packs. Two in the kit. A spare pack is an option for long days.
  • Total station. One robotic total station with tripod.
  • Job computer. On the truck: drawing to hole list, job files, logs and the as-drilled report.
  • Consumables. Bit stock, Class H filter and bags, marking paint.
The drilling base with its column folded flat, driving through the middle of a single doorway, the support truck outside.

What it is not for.

Said plainly, so nobody finds out on site.

  • Post-tensioned slabs without an engineer-signed scan map.
  • Holes over 16 mm and core drilling.
  • Walls, and soffits sloped over 5 degrees.
  • Bare steel deck. That is fastening, not drilling.
  • Setting anchors. The robot drills. People set.
  • Outdoor or wet work, and floors open to the public.
In short

A drilling column on the Site Hand Tradesman. It takes the arms-up hours and the dust, drills from the drawings, and hands back a record of every hole. The operator authorizes the work and the crew sets the anchors.

Tell us the slab, the hole count and the ceiling height.