This model loads Three.js r128 from a local vendor/ folder
(vendor/three.min.js, sibling or parent). No network copy is ever
fetched. Keep the vendor folder next to this file. If every 3D tab
shows nothing, the browser WebGL context cap is the usual cause — close other
3D tabs and check hardware acceleration.
PRIVATE PREVIEW — RESERVATION ACCESS ONLY
STEADY EDDIEPHYSICAL AUTONOMY SYSTEMS
LOADER FAMILY — 3D DEPLOYMENT & SIMULATION
SE-3D-200 · R1.0
SIMULATION — schematic geometry, illustrative colour. No built hardware is depicted or implied.
—
—
—
—
—
—
—
—
SE-3D-200 · LOADER FAMILY
THE NUMBERS — WHAT IS REAL, WHAT IS SCHEMATIC
This panel separates what this
simulation genuinely demonstrates from what it merely sketches. Where a figure exists, it is
stated. Where a figure is not published, this panel says so — it does not invent one.
Live state
CONTROL AUTHORITY NOW
HUMAN-ONLY(reads the running film — schematic status, illustrative only)
MODE LADDER
SE-0 INSTRUMENT (every deployment starts here) →
SE-1 REMOTE (reachable in this film only through the human AUTHORIZE gate) →
SE-2 · SE-3 · SE-4 · SE-5 — LOCKED. Each requires validation plus a fresh,
named human authorization. Downgrade is instant at every rung and needs no gate.
Real in this file — executable, not narrated
Item
What is actually true here
THE AUTHORIZE GATE
The timeline genuinely halts at the gate. No cue, timer
or script passes it — only the AUTHORIZE button. Pressing PLAY instead declines, and the film
continues at SE-0 with nothing commanded. This is doctrine made executable.
INSTANT REVOKE
REVOKE drops SE-1 authority the same frame it is pressed.
There is no confirmation step on the way down, by design.
DEPLOYMENT GRAMMAR
Install once (dock) · deploy when required (Eddie) ·
remove when not (dock stays). The sequence in THE FILM is the product's actual lifecycle claim.
PHYSICAL ACTUATION ONLY
Eddie's actuators seat on the stock steering wheel,
loader joystick and pedals. No CAN, no ECU, no firmware integration — ever. Human controls always
remain in place.
SCALE CONVENTION
1 world unit = 1 metre. The crew figure is 1.8 m and is
the only certified scale reference in the scene.
SE-1 SEGMENT LENGTH
The teleoperation work segment in this film runs 16
simulated seconds and repeats a generic load-and-carry cycle. It is a film beat, not a measured
cycle time.
RELEASE SET
This is 1 of 9 SE-3D deployment simulations in the R1.0 set
(SE-3D-100 … SE-3D-900), one per machine family. All nine share the same six views and the same
doctrine. This file: SE-3D-200 R1.0, 2026-08-16.
Schematic in this file — drawn, not engineered
Item
Status
MACHINE GEOMETRY
Class-typical articulated wheel loader proportions.
Boxy on purpose. No dimension is taken from any OEM model and none is a certified engineering
dimension.
WORK SITE
Stockpiles, hardstand, haul road, hopper and truck are generic
material-handling furniture at plausible scale. Distances are compressed for the camera.
SAFETY FIELDS
The stop field and warning field drawn in EYE IN THE SKY are
illustrative envelopes. Field radii shown are not published safety distances and must not be read
as such.
TELEMETRY
LINK / ENVELOPE / E-STOP status text is schematic status,
illustrative only.
Not published — stated rather than invented
PERFORMANCE FIGURES
No payload, cycle-time, availability,
utilisation or productivity figure for the Loader family is published in this preview.
HARDWARE FIGURES
Eddie unit mass, actuator forces, grip limits,
latch mechanism, power arrangement and dock fastener specification are not published.
SAFETY DISTANCES
Certified stop-field and warning-field radii
are not published; the zones drawn here are illustrative.
PRICE & AVAILABILITY
Not published. This is a private
preview under reservation access.
DOCUMENT PACK COUNT
The engineering document pack count for the
Loader family is not published in this preview.
Reading the colour — the palette is the argument
Colour
Meaning
CONSTRUCTION YELLOW
The host OEM machine — "yellow
iron", untouched. Generic North-American construction yellow; no manufacturer's livery is
reproduced or implied.
STEADY EDDIE RED
Only what Steady Eddie adds: the
dock, the Eddie unit, the actuators, the transit route, the stop field. If it is red, it is the
retrofit; if it is yellow, it was already there.
BRIGHT STEEL
Working wear surfaces — lift arms,
cylinders, bucket lip and teeth.
AMBER
The warning field and site furniture (cones,
hi-vis, beacon) — attention, not prohibition.
EARTH TONES
The site: soil, subgrade, aggregate,
concrete, verge grass — zone-coloured so the work area reads at a glance.
The six views — identical across all nine SE-3D files
View (key)
What it is for
THE FILM (1)
The deployment narrative: machine → dock → Eddie → engage →
SE-0 → the human gate → SE-1 → removal. The gate genuinely blocks.
THE MACHINE (2)
Close orbit on the loader and the SE hardware. Free
exploration; click parts for their honest one-liners.
WORK AREA (3)
The site at working distance, with the duty loop drawn on
the ground: dig → carry → load truck / charge hopper.
EYE IN THE SKY (4)
The site supervisor's overwatch: geofence, stop and
warning fields, machine heading, crew exclusion, true 50 m scale bar.
THE PROGRAM (5)
The pull-back: three loaders, one Eddie, one envelope,
the mode ladder standing in the scene with SE-2…SE-5 locked.
THE NUMBERS (6)
This panel — what is real, what is schematic, what is
not published.
CONTROLS — DRAG orbit · WHEEL/PINCH zoom · RIGHT-DRAG pan · SPACE play/pause · ARROWS step ·
KEYS 1–6 switch view · CLICK objects for details. Free orbit works in every view.
NO DIMENSION SHOWN ANYWHERE IN THIS SIMULATION IS A CERTIFIED ENGINEERING
DIMENSION. SCHEMATIC GEOMETRY AND ILLUSTRATIVE COLOUR THROUGHOUT — NO BUILT HARDWARE IS DEPICTED
OR IMPLIED. PATENT PENDING. NOT AFFILIATED WITH OR ENDORSED BY ANY OEM.
AI PLANS. RULES GOVERN. HUMANS AUTHORIZE. SAFETY HAS VETO.
Human decision required. Press PLAY instead to decline and hold at SE-0.
STEADY EDDIE · PHYSICAL AUTONOMY SYSTEMS
LOADER FAMILY
SE-3D-200 · 3D DEPLOYMENT & SIMULATION · R1.0
A class-accurate schematic wheel loader, then the full Steady Eddie deployment sequence. Dock installs once and stays. Eddie deploys when
required and is removed when not. The mode ladder climbs only through a human
authorization gate; downgrade is instant.
SIMULATION — schematic geometry. No built hardware is depicted or implied.
DRAG — ORBIT · WHEEL / PINCH — ZOOM · RIGHT-DRAG — PAN
SPACE — PLAY/PAUSE · ARROW KEYS — STEP THE SEQUENCE · KEYS 1–6 — SWITCH VIEW
VIEWS: THE FILM · THE MACHINE · WORK AREA · EYE IN THE SKY · THE PROGRAM · THE NUMBERS
SEQUENCE COMPLETE
DOCK STAYS. EDDIE MOVES.
The machine is back to human-only — same controls, same machine.
The dock waits, empty, for the next deployment. Higher modes SE-2…SE-5 stay
locked: each requires validation and a fresh human authorization.
AI plans. Rules govern. Humans authorize. Safety has veto.